+91 94442 42432, +91 4435690278

info@airaqualabs.com, airaqualabs@gmail.com

Environmental Consultancy And Affiliation Services

Enquiry Form

Environmental Consultancy and Affiliation Services

We offer a wide range of consultancy & affiliation services by obtaining Environmental Clearances, getting consents and approvals from Tamil Nadu Pollution Control Board (CTE, CTO, HWA, and BMWA) and Other State Pollution Control Boards, Ground Water Clearance (GWC) and Single Window Clearances such as Inspector of Factory License, Fire NOC etc.

We are accredited by NABET which comes under Quality Council of India (QCI)

  • Consent to Establishment (CTE) from TNPCB for Proposed / Expansion Projects and CTE Extension
  • Obtaining Consent to Operate (CTO) from TNPCB for Proposed / Expansion Projects and Obtaining Consent Renewals
  • Obtaining Hazardous Waste/ E-Waste/ Biomedical Waste Authorization from TNPCB
  • Environmental Audits/ Statements
  • Hydro geological Study
  • Environment Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA) and MoEF & CC, Govt of India, New Delhi
  • Consent to Establish(CTE), Consent to Operate (CTO), Renewal of Consent (RCO), Hazardous Waste Authorization (HWA), Biomedical Waste Authorization (BMWA) and E-Waste from Tamil Nadu Pollution control board (TNPCB) and other State Pollution Control Boards (SPCB)
  • CRZ (Coastal Regulation Zone) Clearances from CZMA (Coastal Zone Management Authorities)
  • Ground Water Clearance
  • Single Window Clearances
  • DPR (Detailed Project Reports) for various Government & Private Funded Projects
  • Adequacy Report for STP & ETP
  • Environmental Audit
  • PESO License

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)

Sectors :
  • Mining and Minerals
  • Single Window Clearances
  • Metallurgical Industries (Ferrous & Non Ferrous)
  • Cement Plants
  • Synthetic organic chemicals industry
  • Building and Construction Projects
  • Area Development Projects and Townships
Stages of Environmental Clearance process
  • Screening & Scoping for EIA - Rapid EIA study & Comprehensive EIA study
  • Study as per Terms of Reference (TOR) granted by the MOEF/SEIAA
  • Baseline Studies
  • Public Hearing/Public Consultation
  • Impact Assessment & Mitigation Measures
  • Risk Assessment
  • Presentations to Expert Appraisal Committee at Central & State Level
  • Obtaining Environmental Clearance (EC) from MoEFCC/SEIAA

CONSENTS & APPROVALS FROM TNPCB & OTHER SPCB

  • Consent to Establish (CTE) under Air & Water act
  • Consent to Operate (CTO) under Air & Water act
  • Renewal of Consent under Air & Water act
  • Hazardous Waste Authorisation (HWA)
  • Biomedical Waste Authorisation (BMWA)
  • E-Waste Authorisation
  • Annual Returns & Environmental Statement
  • EC Compliance report preparation

COASTAL REGULATION ZONE (CRZ) CLEARANCE

  • Screening & Scoping for EIA
  • Rapid EIA study
  • Coordination for HTL (High Tide Line) & LTL (Low Tide Line) Demarcated CRZ Maps from Indian Remote Sensing (IRS) Department
  • Presentation to District, State & Central Level Coastal Zone Management Authorities
  • Obtaining Coastal Regulation Zone (CRZ) Clearance

GROUND WATER CLEARANCES

  • Provide consulting & affiliation services for obtaining Ground water Clearance from Ground water division of Public Works Department (PWD)
  • Undertake application preparations and submission of report in line with the Discussion with authority
  • Site Inspection and yield test by Government authorities

SINGLE WINDOW CLEARANCES

  • We take single handed responsibility for obtaining the final approval such as Inspector of Factory License, Fire NOC etc
  • We undertake application preparations and submission of drawings in line with norms & to the Government Authorities
  • Clarifications & Updates in the drawings will be done as per the Client’s requirements

URBAN PLANNING, ARCHITECTURE & DETAILED ENGINEERING SERVICES

  • Concept Design & Master Planning
  • Pre-Feasibility, Feasibility and Detailed Project Reports
  • Pre-proposal activities in respect of preparation of bid documents for inviting tenders
  • Post- tender activities in respect of evaluation, design optimization, award of work, Detailed engineering design and drawings
  • Proof checking and peer review consultancy

DETAILED PROJECT REPORT (DPR)

  • We take up DPR Preparations for Government as well as Private Funded Projects
  • Site study, preparation of pre-feasibility report
  • Preparation of details project reports for
  • Solid Waste Management Projects/Dump yards
  • Sewage Treatment Plants
  • Effluent Treatment Plants
  • Zero Liquid Discharge Systems
  • Water Treatment Plants
  • Our Reports are vetted by Anna University & IIT, Madras for Project Execution

ADEQUACY REPORT

  • To check the design, actual measurement and flow scheme of treatment plants.
    • ENVIRONMENTAL AUDIT

      To measure and identify the effects of certain activities on the environment against set criteria or standards.

      Steps :
      • Planning the audit
      • Review the company’s environmental protection policy
      • Assessment of the organization
      • Gather data
      • Evaluate overall performance
      • Identify improvement areas
      • Findings and Report